Texas Instruments TPS25869Q1EVM-163 Evaluation Module (EVM)

Texas Instruments TPS25869Q1EVM-163 Evaluation Module (EVM) is designed to help evaluate TI's TPS25869-Q1 USB Type-C® and type-A ports. These ports can provide up to 5.6A output current, 2.4A for Type-A port, 3A for Type-C port, and 200mA for output. The Texas Instruments TPS25869Q1EVM-163 operates over a range from 5.5V to 26V and withstands 40V transient voltage. Resistors can adjust the switching frequency on the evaluation module. It's also integrated with a Fault indicator and separate on and off control.

Features

  • 5.5V to 26V input range, 2.4A continuous output current buck converter for Type-A port, and 3A for Type-C port
  • 200mA capability for OUT pin, 200mA capability for VCONN power meeting for USB3.1 power requirement
  • Fully AEC-Q100 qualified
  • Forced PWM operation with Spread-Spectrum dithering at 200kHz–800KHz
  • Smart thermal management
  • User-programmable VBUS current limit and internal VCONN current limiting

Applications

  • Automotive
    • USB media hubs
    • USB charging ports
    • Aftermarket dual USB chargers

Board Setup

Mechanical Drawing - Texas Instruments TPS25869Q1EVM-163 Evaluation Module (EVM)
Publicerad: 2021-10-08 | Uppdaterad: 2022-03-11